Recommendations and Instructions
for Hot Torquing Gage Glasses and
Probe Type Devices
When a new piece of equipment, whether a Gage Glass or a Probe* type device is
installed, the hot torque procedure must be performed. This ensures that all bolting
and components are properly seated for optimum performance. This procedure
must also be performed after any maintenance is done to the equipment. Note that
only the affected components, such as the installation of a new probe or glass kit,
need to be hot torqued.
All work must be done by a qualified technician. All plant rules and procedures
must be followed, including any lock out / tag out requirements. Verify that all
alarms and trips have been by-passed on probe columns before any maintenance
is performed, to prevent any false alarms or wiring hazards.
The hot torque procedure should be performed as follows:
1) Isolate the gage glass or probe device from any pressure.
2) Fully open the drain valve to evacuate any built up pressures and to allow the
contained steam and water to escape during equipment warm up.
3) Slowly open the steam valve to allow a gentle rush of steam to flow through the
equipment. This should take approximately 5 10 minutes. The observer should
see the High Temperature lubricant sizzling and smoke emanating from the gage
of column. This is an indication that the equipment has reached the operating
temperature.
4) When the equipment has been properly heated, close the steam valve. The drain
valve should remain open to allow any residual steam or pressureto escape.
5) Immediately re-torque the equipment to the correct values stated in the applicable
instruction manual. There should be movement of approximately 1/8
th
of a turn or
more.
6) If there is no movement of the bolting or probes, the equipment was not heated
properly. Repeat the procedure.
7) Once the hot torque procedure is completed, close the drain valve, and the
equipment can be put back into service. Carefully check for any leaks in the
equipment and verify proper operation of all illumination, relay controls and wiring,
or other accessories.